Alterations and additions to an existing three-storey residence
originally built as a 1950’s double brick cottage and renovated in the 1990’s.
The site is within a Bushfire (Flame Zone) Area
My role involved working with the Architect and Clients to
take the schematic design through design development phase and onto contract
documentation stage. Working closely with the clients. I prepared the tender
documents and conducted cost analysis of the final tender prices, involving a thorough
analysis of the feasibility of the project against the opinion of probable
cost. The project began construction phase in August 2010 and part of my role
was putting together the final contract package, and a continued role in
updating any changes to the package. The contract is a Cost Plus between the
owner and contractor. I had a role in advising the client through the contract
administration process and attending monthly site meetings.
Project date for completion December 2011.